Painting Change-Order Price & Margin Calculator

Price a change order from its incremental costs, then combine it with the original job to check the revised total margin. Added revenue is not the same as added profit.

Free to useNo email requiredDownload your worksheet
Calculate your result

Change-order pricing: interactive worksheet

01

Make it your business

Start with an example, then replace the assumptions. Results update as you type.

Examples illustrate different workloads. They are not market averages or recommended prices.

Customer price before the proposed change.

Full cost before the change, including allocated overhead.

Total incremental labor across all painters.

Only materials caused by the change.

Profit as a share of selling price, after all costs entered. A 25% margin is not a 25% markup.

Cost & schedule assumptions 4 inputs

These example values affect your result. Review each before relying on the worksheet.

Include a fair cost for your own labor even when you work alone.

Your employer taxes, workers' comp, benefits and paid-time allowance as a percentage of wages. Avoid double counting separate cost fields.

Incremental rentals or access equipment.

Only incremental overhead not already budgeted.

Export to keep your work. Refreshing or leaving this page clears your inputs and saved comparison.

Understand the result

The method,
made clear.

Change cost = added loaded labor + materials + equipment + added overhead. Change price = change cost ÷ (1 − target margin). Revised job margin = (original price + change price − original cost − change cost) ÷ revised price.

A profitable change order does not automatically repair an underpriced original job. Check both the incremental and whole-job results.

How to use this tool

  1. 01

    Replace the example inputs with your actual costs and work estimates.

  2. 02

    Compare the result with a real completed job or your current operating budget.

  3. 03

    Adjust the assumptions, download your worksheet, and review the relevant insurance questions before your business changes.

Worked example

Using the illustrative inputs below produces change-order price: $626.67. These are example business assumptions, not market benchmarks.

Original job price
5,000 $
Original estimated job cost
3,750 $
Added painter-hours
8 hours
Hourly wage or owner labor allowance
25 $/hour
Additional payroll burden
20 %
Added materials
150 $
Added equipment cost
50 $
Added overhead
30 $
Target operating margin
25 %

Revised total job price: $5,626.67

Revised job profit: $1,406.67

Revised job margin: 25%

Before you rely on the numbers

Assumptions
and limitations.

  • Every prefilled number is an illustrative example, not a market average, recommended price, tax rate, or insurance quote.
  • Results use only the costs and time you enter. Include owner compensation, insurance and overhead where applicable without counting a cost twice.
  • Calculations exclude sales tax and financing unless you include them in your inputs. Round your final customer price deliberately.

From planning to protection

Your next
insurance question.

When a change adds different activities, higher access or subcontractors, review whether your insurance information needs updating.

Explore painting insurance

Worksheet inputs are not submitted to a carrier or added to an insurance application. Confirm the facts in the quote form before you submit.

Explore business insurance

Before you rely on any coverage, confirm it suits your business with a licensed insurance professional.

Tell us about your actual business. Available quote paths depend on your work, state, coverage and underwriting information.

Educational information, not a coverage determination. Examples are hypothetical. Policy wording, exclusions and underwriting decide whether coverage applies.

Questions owners ask

A few useful answers.

Should I include costs already in the original bid?
No. Include only additional costs in the change order. The original cost field already accounts for the original scope.
Does this authorize work outside the original scope?
No. Confirm the written scope change and approval process with your customer before doing additional work.
Why can the revised margin be below my target?
The target applies to the new change. The original job may carry a different margin, which affects the combined result.

Keep planning

The next useful tool.

Sources and methodology

Prepared by Kinro. Methodology and linked references checked 2026-10-29. Calculation formulas are Kinro planning models. Sources support the concepts stated below; they do not endorse our example values or results.

Educational planning only. Confirm coverage, requirements and policy suitability with a licensed insurance professional. No coverage is quoted, bound or changed by using a worksheet.